1 |
AJI WAHYU PAMBUDI |
167011115 |
ANALISIS WAKTU DAN BIAYA DENGAN METODE EARNED VALUE ANALYSIS (STUDI KASUS PROYEK PEKERJAAN OVERLAY RUNWAY BANDAR UDARA SYAMSUDIN NOOR BANJARMASIN) |
2 |
RIAN FAUZI |
167011124 |
EVALUASI DAN OPTIMALISASI INSTALASI PENGOLAHAN AIR MINUM PDAM KOTA BALIKPAPAN (STUDI KASUS IPAM ZAM PRIMA BALIKPAPAN) |
3 |
SAVERO IMANSYAH DUNGGA |
167011157 |
ANALISIS PEKERJAAN PROYEK PENAMBAHAN FASILITAS RUANG KELAS SDN 033 BALIKPAPAN UTARA DENGAN METODE TIME COST TRADE OFF (TCTO) |
4 |
FITRA RANU PRATAMA |
167011119 |
OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PENAMBAHAN BANGUNAN PASAR RAKYAT KM.12 KARANG JOANG BALIKPAPAN |
5 |
PARJIHAN TAUFIK RACHMADI |
167011118 |
ANALISIS BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE ANALYSIS PADA PROYEK OFFICE |
6 |
MURSYIDUR RIZAL |
147010944 |
ANALISA KARAKTERISTIK PARKIR DI RUMAH SAKIT UMUM DAERAH (RSUD) AJI BATARA AGUNG DEWA SAKTI SAMBOJA |
7 |
DAUD RICHARD IMANUEL |
157011110 |
Evaluasi Pekerjaan Proyek Penanganan Bencana Longsor Kelurahan Muara Rapak Gang Putingan dengan Metode CPM dan Pert |
8 |
PATIMAH |
167011173 |
PENELITIAN PERENCANAAN CAMPURAN ASPAL BETON AC-WC (ASPHALT CONCRETE-WEARING COURSE) DENGAN MEMANFAATKAN ENDAPAN SEDIMEN AIR PDAM SEBAGAI BAHAN FILLER |
9 |
DAEGAL OREA P.P |
131067011010779 |
Korelasi Nilai CBR Lapangan dan CBR Laboratorium Untuk Lapisan Subgrade Project EPC Re- Route PT. Pertamina RDMP Refinery Unit V - Balikpapan |
10 |
FEBY WIJAYANI |
157011085 |
Analisis Kinerja Lalu Lintas Ruas Jalan Yos Sudarso Pelabuhan Semayang Balikpapan |
11 |
ARDIANSYAH |
167011223 |
EVALUASI PENGEMBANGAN JALAN DI PENAJAM PASER UTARA MENGGUNAKAN RIGID (BETON) |
12 |
THARRA ULFA |
167011159 |
ANALISIS DAMPAK LALU LINTAS (ANDALALIN) PEMBANGUNAN DEPO KONTAINER, KANTOR, WORKSHOP, PERGUDANGAN DAN LOGISTIC BERIKAT DI JL. PENDEKAT KIK |
13 |
PIERE DOLUDEA |
167011137 |
ANALISA TINGKAT KEBISINGAN AKIBAT AKTIVITAS TRANSPORTASI DI KAWASAN PENDIDIKAN (STUDI KASUS DI SDN 002 JALAN AHMAD YANI BALIKPAPAN TENGAH) |
14 |
LUKMAN HAKIM |
167011138 |
OPTIMALISASI BIAYA DAN WAKTU DENGAN METODE TCTO PEMBANGUNAN RUANG KELAS BARU (RKB) (STUDI KASUS: SD NEGERI 003 KAMPUNG BARU TENGAH BALIKPAPAN) |
15 |
ADHITYA NUR RIZKI |
167011218 |
ANALISIS JADWAL PELAKSANAAN PEKERJAAN DENGAN METODE PDM DAN PERT (STUDI KASUS : SITE DEVELOPMENT LAWE LAWE TERMINAL FACILITY PROYEK RDMP RU V BALIKPAPAN) |
16 |
ESTER MUTIN |
167011217 |
RESPON MASYARAKAT TERHADAP PENGGUNA ZEBRA CROSS DI KOTA BALIKPAPAN |
17 |
SIDIQ PANGESTU |
167011125 |
ANALISIS BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS (EVA) PADA PROYEK PEKERJAAN SITE DEVELOPMENT KANTOR PERTANAHAN |
18 |
YUDHA SUHADA |
167011128 |
OPTIMALISASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK DRAINASE |
19 |
INDRA DARMAWAN |
167011155 |
ANALISA WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PEMBANGUNAN SALURAN DRAINASE RT. 16 KEL. DAMAI BARU |
20 |
FADLIA ULFA |
167011219 |
ANALISA WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA WAREHOUSE SCAFFOLDING STUDI KASUS : PROYEK PEMBANGUNAN WORKSHOP DAN WAREHOUSE RDMP RU V BALIKPAPAN |